Services
Turn-key, which means we own the whole thing.
Tear-down, renovation or ground-up new construction: it is one company, one crew structure and one person accountable to you from the first stake to the final punch list.

Your Vision, Our Craftsmanship
Built from the Ground Up.
Foundation to final finish on your lot. You get one contract, one point of accountability and a schedule tied to inspected milestones instead of promises.
- Site prep, grading and pad work
- Concrete foundation: forms, steel and pours
- Framing, roof dry-in and full mechanical, electrical and plumbing
- Interior and exterior finishes to your selections
- Permitting, inspections and final walkthrough
Who it fitsBest for homeowners with land (or under contract) who want a house designed around how they actually live, and investors building for the open market.

Clear the Past
Build What's Next.
Older San Antonio neighborhoods are full of small, tired houses sitting on excellent lots. Sometimes the right move is to clear the structure and build the house the location deserves.
- Utility disconnects and demolition permitting
- Full or selective demolition
- Debris haul-off and site cleanup
- Grading, pad prep and new foundation
- Rebuild straight through to handoff
Who it fitsBest for inherited properties, storm- or fire-damaged houses, and any home where a renovation would cost nearly as much as new construction.
Tear down or renovate? The short answer
If the foundation is failing, the framing is badly damaged, or a renovation would cost close to new construction, tearing down and rebuilding is usually the better value. CCCS handles the whole job: utility disconnects, the demolition permit, haul-off and the new home. New construction runs $135–$180 per square foot under roof, and demolition is priced separately after we walk the property.
Tear-down example
Alamo Heights area, San Antonio 78209

An older house on a good lot, replaced with a new two-story home built for how the owners live now.
- Location
- San Antonio, TX 78209
- New home
- Two-story, about 3,193 sq ft
- CCCS handled
- Demolition, site work and the new build
- Status
- Under construction
Tear-down questions
Tearing down and rebuilding in San Antonio, answered.
When should I tear down instead of renovate?
When the foundation is failing, the framing has widespread damage, the systems all need replacing, or the layout you want is so different that you'd be rebuilding anyway. Once a renovation approaches about two-thirds the cost of new construction, building new is usually the better value.
Do I need a permit to tear down a house in San Antonio?
Yes. Demolition needs a permit from the City of San Antonio, and older homes or homes in historic districts may need a historic preservation review first. We handle the paperwork.
How much does it cost to tear down and rebuild?
The new home runs $135–$180 per square foot under roof, including plans, permits and standard site work. Demolition, disconnects and haul-off are priced separately after we walk the property.
Can you price both options?
Yes. We walk the house, price renovating and rebuilding, and tell you straight which one makes sense.

Reimagine Your Space
Love Your Home Again.
Full-scope renovation: layout changes, kitchens, baths, systems, floors and finishes, and added space like a primary suite or second story, tied cleanly into the existing structure. When the bones are good, this is the fastest route to a dramatic result.
- Selective demolition
- Wall removals with proper structural support
- Kitchen and bathroom rebuilds
- Room additions and second stories tied into the existing house
- Electrical, plumbing and HVAC updates
- Floors, trim, cabinetry, tile and paint
Who it fitsBest for solid houses with dated or awkward interiors, and for investors improving a property before it goes to market.
Not sure which of these you need?
That's the most common call we get. The analysis sorts it out in a few minutes, or you can just reach out and describe the situation in your own words.
Build Readiness Analysis
Not sure what your property can support?
Take the Build Readiness Analysis. Answer a handful of plain-language questions about your land, your goal and your funding, and we'll lay out the options that actually fit your situation.
Start Your AnalysisTakes about three minutes. No pressure, no obligation.
