For Investors

A spec house is a financial product that happens to be made of concrete and lumber.

If you're building to sell, the numbers are the design brief. We build to the exit, keep the schedule tight because carry is real money, and tell you before we start if the math doesn't work.

The short answer

CCCS builds spec homes for investors in San Antonio from feasibility to sale-ready: a written line-item budget, draws tied to completed and inspected milestones, and weekly photo updates. Build cost typically runs $135–$180 per square foot under roof, lot not included, and most builds take about 9 to 12 months from permit to completion.

The four numbers

Every spec build comes down to these, in this order.

We'd rather talk you out of a bad deal than build one. When these four line up, a spec build is one of the more controllable ways to put capital to work in real estate.

01

Land Basis

What the lot costs you all-in, including closing and any site work it needs before a house can go on it. A bargain lot with a drainage problem isn't a bargain.

02

Build Cost

Hard construction plus soft costs: plans, engineering, permits, utilities and contingency. This is the number most spec budgets underestimate, and it's the one we put in writing before starting.

03

Carry

Interest, taxes, insurance and utilities for every month the house is under construction or sitting. Schedule discipline is a financial line item, not a courtesy.

04

Realistic Exit Band

Not what the best house in the neighborhood sold for: what a house of your size and finish level actually closes at in that submarket right now.

Sample budget

What the build line looks like on a 1,550 sq ft spec home.

An example using our published pricing, so you can see how the numbers are laid out. Your lot, financing and sale costs are your own and vary by deal.

House size under roof1,550 sq ft
Build cost at $135 / sq ft (entry finishes)$209,250
Build cost at $180 / sq ft (upgraded finishes)$279,000
Included in build costPlans, permits, standard site work, utilities
Not included: lot, demolition, loan interest and carry, closing and selling costs

Example only, not a quote and not a projection of profit or returns. Every project is priced in writing after a site and scope review.

Finished CCCS new build in Denver Heights, San Antonio

How we run an investment build

Built for resale, not for a magazine.

  • Plan and finish package selected for the submarket's buyer, not for our portfolio photos.
  • Line-item budget with named allowances so you can see exactly where a dollar was assumed.
  • Draw schedule tied to completed and inspected milestones.
  • Weekly progress with photos. You should never have to ask what happened this week.
  • Long-lead items ordered early, because a six-week window delay is six weeks of carry.
  • Punch list closed before the sign goes in the yard.

Recent investor build

Los Angeles Heights Spec Home

Los Angeles Heights Spec Home

An investor owned the lot and wanted a new home built for the resale market. CCCS designed an efficient plan for the lot and is running construction from site prep through completion.

Owner
Investor-owned
Size
About 1,550 sq ft, 4 bed / 3 bath
CCCS handled
Floor plan, site prep, construction through completion
Status
Under construction
See the project →

Funding paths we build against

Land, Cash, SDIRA or Private Capital.

These are options we see used, described plainly, not financial or tax advice. Your accountant, lender or custodian sets the rules for your money. We build the house.

Cash

Cleanest and fastest. Draws are released against completed, inspected milestones, so your money follows progress rather than leading it.

Land equity

If you already own the dirt, that value can do work in the capital stack. Owning the lot also means feasibility can start immediately instead of after a closing.

Self-directed IRA

Retirement funds are used for real estate construction regularly. Your SDIRA custodian governs how funds are directed and how the asset is titled. Our job is a build that stays on scope and on budget, with documentation clean enough for that custodian's reporting.

Private capital

Private lenders and partners fund builders they can predict. We supply the line-item budget, draw schedule and photo-documented progress that makes that capital comfortable staying in.

Questions investors ask

Spec building in San Antonio, answered.

Do you build spec homes for investors in San Antonio?

Yes. We build spec homes from the ground up on lots investors own or are buying, in San Antonio and surrounding areas, and handle plans, permits and construction through the final punch list.

How much does it cost to build a spec home?

Build cost with CCCS typically runs $135–$180 per square foot under roof, including plans, permits and standard site work. The lot, demolition and your financing costs are separate.

How are draws handled?

Draws are tied to completed, inspected milestones, so your money follows the work. You or your lender get the line-item budget and draw schedule up front.

How will I know what's happening on site?

Weekly progress updates with photos, so you never have to ask what happened this week.

How long does a spec build take?

About 9 to 12 months from permit to completion, depending on size, finishes and inspections.

Build Readiness Analysis

Run your deal through the analysis.

Tell us the lot, the goal, the budget range and how you're funding it. You'll get a straight read on which build approach fits and what we'd look at first.

Start Your Analysis

Takes about three minutes. No pressure, no obligation.

CallStart Analysis