Our Process

Nine steps, in order, with nothing hidden between them.

Most of the stress in construction comes from not knowing what happens next. Here is exactly how a CCCS project moves, so you can see where you are at any point.

  1. 01

    Conversation

    We start by listening. What are you trying to end up with, what do you own, what are you working with financially, and what's your timeline? No plans required. Most people arrive with photos and questions.

    You leave knowing whether your idea is realistic and what the next decision is.

  2. 02

    Site & Feasibility Review

    We walk the property. Utilities, sewer or septic, drainage, access, slab or crawl, tree cover, setbacks and deed restrictions. On an existing house, we look hard at foundation, framing, roof and systems.

    This is the step that prevents the expensive surprises later.

  3. 03

    Scope & Budget

    We turn the goal into a written scope and a line-item budget with real allowances, not a round number designed to win the job and get revised upward three months in.

    You see where every dollar is planned to go before you commit.

  4. 04

    Design & Plans

    Bring your own plans or we coordinate the design. Either way the drawings get checked against the budget and the site before they go to permit, so the house on paper is the house you can afford to build.

    Plans and budget move together, never separately.

  5. 05

    Permitting

    Submittals, plan review comments, and the back-and-forth with the jurisdiction. San Antonio and the surrounding counties each have their own rhythm and we work in all of them.

    You get status updates instead of silence.

  6. 06

    Demolition & Site Work

    Where a tear-down is part of the project: disconnects, demolition, haul-off, grading and pad prep, handled cleanly and with the neighbors in mind.

    A clean site is the first sign of a well-run job.

  7. 07

    Foundation Through Framing

    Concrete is in our name for a reason. Forms, steel, pours, then framing, roof dry-in and the mechanical, electrical and plumbing rough-ins, each stage inspected before the next one covers it up.

    Draws are tied to completed, inspected milestones.

  8. 08

    Finishes

    Insulation, drywall, trim, cabinetry, tile, floors, fixtures, paint. This is the stretch where decisions pile up, so we keep a running selections schedule and stay ahead of long-lead items.

    You always know what decision is coming next and when it's due.

  9. 09

    Walkthrough & Handoff

    We walk the finished house with you, build the punch list together, and close every item. You get your documentation, warranties and a straight answer about anything you're unsure of.

    We'd rather fix it now than have you live with it.

Build Readiness Analysis

Where are you in this process right now?